Project Planning and Cost Estimation with Forsico: A Step-by-Step Guide

Break a project into tasks, assign time and cost to each, and track the total budget from one screen, in 6 steps. AI drafts the plan; you review it.

ForsicoNovember 23, 20263 min read
Task-level cost and duration table in Forsico

Getting a project's budget right at the start is cheaper than any fix later. This guide shows, step by step, how to break a project into tasks, assign time and cost to each one, and track the total budget from a single screen.

Before you start

Have three things at hand: the project goal, the target end date and a rough total budget. They don't need to be exact; Forsico lets you edit them later.

  1. Define the goal and its limits

    Write the goal in one sentence. List what is in scope and what is not. Add the deadline and a rough budget.

  2. Describe the project to the AI Planner

    Type it in plain language or upload your brief, PDF included. Mention team size, deadline and any constraints.

  3. Review the draft tasks

    Check each task: is it realistic, is anything missing? Merge duplicates and split tasks that are too big to track.

  4. Check durations and costs

    Edit the duration and cost of each task. Where a number is a guess, note it and come back to it later.

  5. Choose the cost type

    Tag each task as labor, software, hardware, outsourcing or expense, so you can see where the money goes.

  6. Set dependencies

    Mark which task can't start until another finishes. The Gantt view then shows the critical path.

  7. Assign owners and balance the load

    Give every task an owner. Workload analysis shows when one person is carrying too much.

  8. Check risks, then track

    Look at bottlenecks, budget gaps and the contingency what-if. As work moves, update the plan and watch the estimate at completion (EAC).

  9. Document the plan

    In the Documents section, create a project brief, a proposal or meeting notes from an AI template. Documents stay with your project, and you can edit them together by inviting teammates to the project.

Checklist

  • Goal is clear → Project goal written in one sentence
  • Owners assigned → Every task has a time and cost
  • Dates are realistic → Cost types selected
  • Risks listed → Dependencies and critical
  • Owners assigned, workload balanced
  • Project brief or proposal document created
  • Plan updated as work progresses

Frequently asked questions

How does Forsico calculate cost?

Each task gets an estimated duration and cost, entered by you or suggested by AI. Total cost is the sum of those values; completed and remaining amounts are split by task status.

Are the estimates exact?

No. The AI draft is a starting point. We recommend adjusting it with your own data.

Can I work in different currencies?

Forsico supports TRY, USD and EUR. Each project is tracked in its own currency, and costs from different currencies are not added into a single figure.

Can I change the plan afterwards?

Yes. Tasks, dates, costs and owners stay fully editable.

Can I use it with my team?

Yes. Invite team members to the project and assign tasks.

Can I create documents for my project?

Yes. Forsico has 12 AI document templates, including blog, campaign, SEO, FAQ, technical doc, meeting notes, proposal, user story, release notes, GTM, competitor analysis and B2B proposal. Documents stay with your project.